This is a time-consuming process, on which the fire safety at the facility depends. It includes strobing walls for electrical wiring, drilling holes for sockets and switches, drilling through holes. When such work is completed, wires are laid in the finished strobes, junction boxes and accessories are installed. Wiring installation can be hidden and open. It depends on the characteristics of the object and the wishes of the client.